The struts are starting to come into place.

The centre section has been lifted up and the floats placed in the starting position for assembly.

30.07 - 06.08 - 12.08 - 19.08 - 22.08
30/07/2025
14:03
Arvid Martinussen

The center section is lifted and the floats are placed in the starting position for assembly.Each step requires careful coordination among the team, with close attention paid to labeling hardware and storing components in an organized manner. The workspace is arranged so that every part is accessible, minimizing unnecessary movement and reducing the risk of misplacing fittings. As the canvas is laid out and measured, the team consults reference drawings and checks alignment, ensuring the fabric will be tight and smooth when finally stretched across the structure. The methodical pace ensures progress is steady and setbacks are avoided, setting the stage for the scheduled milestones ahead.

Click on the pictures

© Arvid Martinussen (AM)
30.07 Bård and Gunnar discuss possible solutions
30.07 Bård and Gunnar discuss possible solutions
© AM
30.07 No joint or reinforcement, but a sleeve that is part of the construction in connection with the struts.
30.07 No joint or reinforcement, but a sleeve that is part of the construction in connection with the struts.
© AM
30.07 On the outside of the struts a sleeve has been threaded on, to which the strut shoes are to be welded.
30.07 On the outside of the struts a sleeve has been threaded on, to which the strut shoes are to be welded.
© AM
30.07 The ends of the struts have been welded shut to prevent water from getting in.
30.07 The ends of the struts have been welded shut to prevent water from getting in.
© AM
30.07 A fitting for one of the cross braces has been put in place. The bolt is to go through the strut with a nut on the end.
30.07 A fitting for one of the cross braces has been put in place. The bolt is to go through the strut with a nut on the end.
© AM
06.08: All four strut fittings have been put in place on the floats.
06.08: All four strut fittings have been put in place on the floats.
© AM
06.08: This is what a finished strut fitting looks like.
06.08: This is what a finished strut fitting looks like.
© AM
06.08: The sleeves are to be threaded onto the outside of the struts before they are fixed to the strut. They can thus be adjusted before they are fixed.
06.08: The sleeves are to be threaded onto the outside of the struts before they are fixed to the strut. They can thus be adjusted before they are fixed.
© AM
06.08: What remains is to weld the strut shoes properly to the sleeves. For the time being they are only tack welded.
06.08: What remains is to weld the strut shoes properly to the sleeves. For the time being they are only tack welded.
© AM
12.08. The two struts connected to the engine mount were placed wrongly. They were cut loose with an angle grinder, and the two new ones will be welded into place in the correct position.
12.08. The two struts connected to the engine mount were placed wrongly. They were cut loose with an angle grinder, and the two new ones will be welded into place in the correct position.
© AM
19.08: The floats have been attached to the centre section. We used the big forklift to lift the section to the right height and get the floats in place underneath.
19.08: The floats have been attached to the centre section. We used the big forklift to lift the section to the right height and get the floats in place underneath.
© AM
19.08: The next step is to get the struts into their respective fittings. Then comes the big challenge: all the angles must be right. Here a spirit level, folding rule and several plumb lines are necessary aids.
19.08: The next step is to get the struts into their respective fittings. Then comes the big challenge: all the angles must be right. Here a spirit level, folding rule and several plumb lines are necessary aids.
© AM
22.08: To keep the plumb lines still, the lines with the weights end up in a bucket of water each. A clever trick.
22.08: To keep the plumb lines still, the lines with the weights end up in a bucket of water each. A clever trick.
© AM
22.08: Some of the attachment points are twisted. It is tight, one fitting is twisted a few millimetres, and the possibilities for problems are many. Correcting one error can result in a new problem somewhere else.
22.08: Some of the attachment points are twisted. It is tight, one fitting is twisted a few millimetres, and the possibilities for problems are many. Correcting one error can result in a new problem somewhere else.
© AM
22.08: Several ratchet straps have been used to hold it all in place. The nice thing about ratchet straps is that they are easy to adjust..
22.08: Several ratchet straps have been used to hold it all in place. The nice thing about ratchet straps is that they are easy to adjust..
© AM
22.08: A laser level has also been put to use, and is a great help.
22.08: A laser level has also been put to use, and is a great help.
© AM
22.08: The left side is OK. When everything is in the right position, all the joints and fittings are to be welded.