The main floats

The main floats have arrived in Bodø from Horten. The journey included a long stay at Gardermoen, where curator Mike had to drop by on an errand to get things moving. The floats arrived without damage. In some places the ribs have come loose in the glue from the outer cladding, so that work must be redone. As the pictures show, quite a number of ribs still remain to be put in place, which must be steamed, bent, dried and fitted.

19.03 - 24.03 - 30.04 - E
20/03/2025
13:25
Arvid Martinussen

As part of the ongoing restoration of historic seaplane components, the main floats—crucial for providing buoyancy to the aircraft—have now arrived in Bodø from the Navy Museum in Horten. Their safe arrival marks an important step forward for the project, as these floats are central to the plane's ability to operate on water. The journey included a stop at Gardermoen, where conservator Mike intervened to help expedite the transport. Fortunately, the floats arrived without any transport damage.

However, restoration remains a complex task. Some ribs have detached from the outer plywood skin, often due to the stresses of aging and previous repairs, making it necessary to redo sections to preserve both strength and authenticity. The restoration team must fabricate several new ribs, a meticulous process that involves carefully steaming and bending fresh wood to match the original specifications. Each component must be shaped, dried, and assembled with precision to ensure the structural integrity and historical accuracy of the floats—work that calls for both patience and expertise.

Click on the pictures

© Arvid Martinussen (AM)
19.03 This is what the floats look like before all the ribs and bulkheads are in place and the sides can be closed.
19.03 This is what the floats look like before all the ribs and bulkheads are in place and the sides can be closed.
© AM
19.03 Some of the ribs have come loose in the glue and must be glued again. It is advisable to press the outer walls together as the ribs are inserted
19.03 Some of the ribs have come loose in the glue and must be glued again. It is advisable to press the outer walls together as the ribs are inserted
© AM
19.03 The floats have a shape that differs greatly from the appearance of modern floats.
19.03 The floats have a shape that differs greatly from the appearance of modern floats.
© AM
24.03 The "forest" of glue clamps shows that a lot had to be reglued or put right on the newly arrived floats.
24.03 The "forest" of glue clamps shows that a lot had to be reglued or put right on the newly arrived floats.
© AM
29.03 The ribs were undersized compared with the drawing. Reinforcements were glued on. The nearest rib is as per the drawing and is a few millimetres thicker than the others.
29.03 The ribs were undersized compared with the drawing. Reinforcements were glued on. The nearest rib is as per the drawing and is a few millimetres thicker than the others.
© AM
29.03 Some ribs have been reinforced on both sides.
29.03 Some ribs have been reinforced on both sides.
© AM
29.03 Shaping the bow of the float must be done gradually. The clamp is tightened little by little, otherwise things easily come apart in the glue or the material cracks.
29.03 Shaping the bow of the float must be done gradually. The clamp is tightened little by little, otherwise things easily come apart in the glue or the material cracks.
© AM
29.03 About 1200 of these are to be used.
29.03 About 1200 of these are to be used.
© AM
29.03 A copper boat rivet meant for fine joinery and, for example, building canoes.. We got hold of them in England.
29.03 A copper boat rivet meant for fine joinery and, for example, building canoes.. We got hold of them in England.
© AM
30.04 Bård is drilling holes for the approx. 2500 brass screws that are to hold the side panels to the frame
30.04 Bård is drilling holes for the approx. 2500 brass screws that are to hold the side panels to the frame
© AM
30.04 The screw heads must be countersunk.
30.04 The screw heads must be countersunk.
© AM
30.04 Parts for one of the inspection hatches to the chambers in the floats
30.04 Parts for one of the inspection hatches to the chambers in the floats
© AM
30-04 Finished hatch, ready for fitting, seen from below. Per has made a hatch for each of the chambers.